Assembling a collaborative project team: Practical tools including multidisciplinary schedules of services
By: Sinclair, Dale.
Material type:
Item type | Current location | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|
![]() |
University Library, PLCSUPVA, Rohtak | AR 624.0684 Si62A (Browse shelf) | Available | 13734 |
Browsing University Library, PLCSUPVA, Rohtak Shelves Close shelf browser
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
AR 624.0681 D954E(27) Estimating and costing in civil engineering : Theory and practice including spacifications and valuations | AR 624.0681 D954E(27) Estimating and costing in civil engineering : Theory and practice including spacifications and valuations | AR 624.0684 M293C Communicating construction: Insight, experience and best practice | AR 624.0684 Si62A Assembling a collaborative project team: Practical tools including multidisciplinary schedules of services | AR 624.09 I821B V1 Building knowledge, Constructing histories Vol. 1 | AR 624.092 F665G Good guys, Wiseguys, and putting up buildings: A life in construction | AR 624.1 R141T(11) Theory of structures |
There are no comments for this item.